Interreg EMFloodReslience WPT4.3.1: A beta version of a flash flood early warning system for several tributaries of the Meuse
doi: 10.4121/a91158d6-887f-4d6c-bc17-fc79d73809e7
Data and Scripting for the project: Interreg EMFloodReslience WPT4.3.1: A beta version of a flash flood early warning system for several tributaries of the Meuse.
The data includes the raw model run output from Delft-FEWS configurations, the post-processed output, and the statistical analyses results. Aim of the project is to test the added value of a STEPS-Blending rainfall prediction product for accurate forecasting of discharges in the Dommel, Demer, Rur, Geul, Vesdre catchments based on 3 historical rainfall events. Data includes: 1. Raw discharge estimates of 48 ensemble members per catchment, per rainfall event, and per forecast product. 2. Post-processed discharge estimates of 48 ensemble members per catchment, per rainfall event, and per forecast product. 3. Statistical analyses includes deterministic, probabilistic, contingency, threshold based results. 4. Plots.
- 2023-12-12 first online, published, posted
- Interreg EMFloodResilience Project Interreg EMR
Waterschap Limburg, the Netherlands
Wasserverbund Eifel-Rur, Germany
DATA
- 2,115,212,184 bytesMD5:
9efa57c9f66cfa3bb4494e1ebc41a0d8
Interreg_WPT4.3.1_data_scripts.zip -
download all files (zip)
2,115,212,184 bytes unzipped