Electric Vehicle Charging Session Data of Large Office Parking Lot

doi:10.4121/80ef3824-3f5d-4e45-8794-3b8791efbd13.v1
The doi above is for this specific version of this dataset, which is currently the latest. Newer versions may be published in the future. For a link that will always point to the latest version, please use
doi: 10.4121/80ef3824-3f5d-4e45-8794-3b8791efbd13
Datacite citation style:
de Bont, Kevin; Hoogsteen, Gerwin; Hurink, Johann; Kokhuis, Richard; Kusche, Fabian et. al. (2024): Electric Vehicle Charging Session Data of Large Office Parking Lot . Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/80ef3824-3f5d-4e45-8794-3b8791efbd13.v1
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset

The dataset corresponds to the a.s.r. living lab of the SmoothEMS met GridShield project. The living lab is an office parking lot located in Utrecht, the Netherlands, that hosts EV charging infrastructure for employees and visitors. All datapoints describe electric vehicle charging sessions recorded on-site. The data was collected between August 25th, 2020 and October 2nd, 2024. At the end of the measurement period, about 300 charging points were installed on-site. 

history
  • 2024-12-10 first online, published, posted
publisher
4TU.ResearchData
format
.csv
funding
  • SmoothEMS met GridShield (grant code MOOI32005) [more info...] Dutch ministries of EZK and BZK
organizations
Amperapark;
a.s.r. verzekeringen;
ElaadNL;
MENNEKES eMobility;
Kropman Installatietechniek;
University of Twente, Department of Electrical Engineering, Mathematics and Computer Science (EEMCS)

DATA

files (3)