Bow Thruster Currents at Open Quay Constructions on Piles
Datacite citation style:
Van Doorn, R. (Rory) (2013): Bow Thruster Currents at Open Quay Constructions on Piles. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/uuid:8ed1cae4-e1cd-419b-b9e6-159456000b98
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
usage stats
1223
views
197
downloads
licence
4TU General Terms of Use
Research into hydraulic loads by a bow thruster.
The hydraulic loads on the slope at an open quay construction on piles is investigated. The propeller (bow thruster) jet induces hydraulic loads on the bed, which could result in scour holes and damage to the quay construction. Performed scale model tests provide details about the hydraulic loads in this specific situation with an inclining slope and piles. Measurements are compared to the current engineering guidelines, to include in the design of open quay constructions on piles.
history
- 2013-05-31 first online, published, posted
publisher
TU Delft, department hydraulic engineering
format
media types: application/octet-stream, application/pdf, application/vnd.ms-excel, application/x-koan, application/zip, image/jpeg
organizations
TU Delft, Faculty of Civil Engineering and Geoscience, Department of Hydraulic Engineering
DATA
files (1)
- 648,019,611 bytesMD5:
0191e3d431480b3762a47e72dc071c45
data.zip -
download all files (zip)
648,019,611 bytes unzipped