Toe structure for rubble mound breakwaters: analysis of toe bund design tools and a method for toe rock stability description
Datacite citation style
Baart, S.A. (2013): Toe structure for rubble mound breakwaters: analysis of toe bund design tools and a method for toe rock stability description. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/uuid:4d63df11-914d-430f-989b-16c09e0bd743
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite
Dataset
Usage statistics
1298
views
197
downloads
Categories
Licence 4TU General Terms of Use
Interoperability
Computation of toe stability of breakwaters comparing results with datasets of Gerding, Docters van Leeuwen, Nammuni-Krohn, MAST and USACE. Contains original data from these researchers
History
- 2013-02-27 first online, published, posted
Publisher
TU Delft, department hydraulic engineeringFormat
media types: application/vnd.ms-excelOrganizations
TU Delft, Faculty of Civil Engineering and Geoscience, Department of Hydraulic EngineeringDATA
Files (1)
- 4,228,096 bytesMD5:
3b6b18fb7f5a12ead748e127aac1d85f
Baart2008.xls