Bow Thruster Currents at Open Quay Constructions on Piles

Datacite citation style:
Van Doorn, R. (Rory) (2013): Bow Thruster Currents at Open Quay Constructions on Piles. Version 1. 4TU.ResearchData. dataset. https://doi.org/10.4121/uuid:8ed1cae4-e1cd-419b-b9e6-159456000b98
Other citation styles (APA, Harvard, MLA, Vancouver, Chicago, IEEE) available at Datacite

Dataset

Research into hydraulic loads by a bow thruster. The hydraulic loads on the slope at an open quay construction on piles is investigated. The propeller (bow thruster) jet induces hydraulic loads on the bed, which could result in scour holes and damage to the quay construction. Performed scale model tests provide details about the hydraulic loads in this specific situation with an inclining slope and piles. Measurements are compared to the current engineering guidelines, to include in the design of open quay constructions on piles.

History

  • 2013-05-31 first online, published, posted

Publisher

TU Delft, department hydraulic engineering

Format

media types: application/octet-stream, application/pdf, application/vnd.ms-excel, application/x-koan, application/zip, image/jpeg

Organizations

TU Delft, Faculty of Civil Engineering and Geoscience, Department of Hydraulic Engineering

Contributors

  • Blokland, T.
  • Uijttewaal, W.S.J. (Wim)
  • Vellinga, T.
  • Verhagen, H.J. (Henk Jan) orcid logo
  • Verheij, H.J.

DATA

Files (1)

  • 648,019,611 bytesMD5:0191e3d431480b3762a47e72dc071c45data.zip