*** Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly *** Author: Liming Zhao Chongqing University Contact Information: 2354734069@qq.com *** General Introduction *** According to the numbers of product and processing factory, 35 sets of data are formed, which conform to the distributed assembly flexible job shop scheduling problem with flexible assembly. Among them, the number of processing factory ranges from 2 to 8, and the number of product ranges from 2 to 6, 6 to 10, 10 to 14, 14 to 18, 18 to 22, 22 to 26 and 26 to 30. In addition, the data in each sheet represents a scale. The basic unit of measurement for all data is "1". *** Purpose of the dataset *** The purpose of this dataset is to provide experimental data on the distributed assembly flexible job shop scheduling problem with flexible assembly. *** Description of the data in this data set *** Each sheet contains four groups of data from top to bottom. The first group provides information about products (involving due date and unit tardiness cost), jobs, processing operations and assembly operations; The second group provides information on the composition of machines in processing factories and assembly factories; The third group and the fourth group provide the available machine information of the processing operations and the assembly operations respectively.