TY - DATA
T1 - Data underlying the research of Distributed assembly flexible job shop scheduling problem with flexible assembly
PY - 2022/01/06
AU - Liming Zhao
UR - https://data.4tu.nl/articles/dataset/Data_underlying_the_research_of_Distributed_assembly_flexible_job_shop_scheduling_problem_with_flexible_assembly/17878508/1
DO - 10.4121/17878508.v1
KW - Distributed scheduling
KW - flexible assembly
KW - Job Shop Scheduling Problems
N2 - According to the numbers of product and processing factory, 35 sets of data are formed, which conform to the distributed assembly flexible job shop scheduling problem with flexible assembly. Among them, the number of processing factory ranges from 2 to 8, and the number of product ranges from 2 to 6, 6 to 10, 10 to 14, 14 to 18, 18 to 22, 22 to 26 and 26 to 30. In addition, the data in each sheet represents a scale. The basic unit of measurement for all data is "1".
ER -