data.zip (44.71 MB)
Download fileSupplementary material for the paper: Take-over quality: Assessing the effects of time budget and traffic density with the help of a trajectory-planning method.
dataset
posted on 2020-05-19, 00:00 authored by F. (Fabian) Doubek, E. (Erik) Loosveld, R. (Riender) Happee, Joost de WinterJoost de WinterSupplementary materials for the paper
Doubek, F., Loosveld, E., Happee, R., & De Winter, J. C. F. (2020). Take-over quality: Assessing the effects of time budget and traffic density with the help of a trajectory-planning method. Journal of Advanced Transportation, 2020, 6173150.